Send your construction pics to uploads @ casinee.com

Reply to Thread
Posts 1 - 6 of 6
Local Name:
上葡京
Budget:
4.6B
Announced:
2013
Construction Start:
13 Feb 2014
Opening:
2018
Location:
Macau
Area:
6 ha
Developer:
SJM Holdings Limited
Operator:
Feasibility Study / Consultants:
Designers:
Contractors:
Ride Suppliers:
Other Suppliers:
  1. Rantanplan is offline Park Investigator
    Join Date
    Jul 2018
    Posts
    6
    Mid June 2018 pics:










  2. mrg
    mrg is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    451

  3. Any concrete opening date?

  4. mrg
    mrg is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    451

  5. Pictures taken on 15 August 2017:











  6. admin is offline Administrator
    Join Date
    May 2011
    Posts
    151

    Grand Lisboa Palace

    Status: under construction

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts