Send your construction pics to uploads @ casinee.com

Reply to Thread
Posts 1 - 7 of 7
Local Name:
កាស៊ីណូ
Budget:
370M
Announced:
2012
Construction Start:
Nov 2012
Opening:
2017
Location:
Phnom Penh, Cambodia
Area:
2 ha
Developer:
NagaCorp
Operator:
Feasibility Study / Consultants:
Designers:
Contractors:
CFC Cambodia
Ride Suppliers:
Other Suppliers:

  1. Hong Kong-listed NagaCorp, which holds the monopoly on operating casino tables in the capital until 2035, recently soft-opened Naga2, the second phase of the existing NagaWorld, a hotel, gaming and entertainment complex that sits next to Cambodia’s foreign affairs ministry and National Assembly, near the Mekong River.
    Posted on 17 November 2017

    Source:
    http://www.scmp.com/business/companies/article/2119183/while-macau-loses-its-lustre-cambodian-casino-bets-chinese

  2. Yes, soft-opening has happened!


  3. Looking at the picture I assume Nagaworld 2 is up and running now? Any pictures from the inside?

  4. mrg
    mrg is offline themeparX Top Investigator
    Join Date
    Mar 2016
    Posts
    450

  5. Pictures taken 28 August 2017:







  6. admin is offline Administrator
    Join Date
    May 2011
    Posts
    151

    Nagaworld 2

    Status: under construction

Posting Permissions

  • You may not post new threads
  • You may post replies
  • You may post attachments
  • You may not edit your posts